This is from a press kit detailing the first manned Mercury sub-orbital launch, Mercury-Redstone3. The material in the kit was issued by NASA to all news media for release Saturday April 29, 1961. It was written before the event took place and I have kept the tense as it is.

The kit contains eleven sections:

  1. Mercury-Redstone 3
  2. Astronaut observations and control tasks during manned Mercury flight.
  3. Pilot preparation for the MR-3 flight.
  4. MR-3 inside the pilot's cabin.
  5. Mercury-Redstone launch vehicle.
  6. MR-3 recovery operations.
  7. Project Mercury Progress.
  8. "IF" A study of contingency planning for the project Mercury mission.
  9. Mercury-Redstone abort.
  10. Astronaut biographies.
  11. Astronaut training program summary.



http://www.pambytes.com
Email question or comments to
pambytes@tgn.net